Proof, measured in tons diverted

DEPLOYED ON THIS SITE

GF-S2200 AquaPure WTX-500 SolarDry BD-90 Telemetry Cloud Odor Control

Landfill diversion 94%
Process water reuse 88%
Energy recovered on-site 76%

They processed in fourteen months what our previous contractor projected for four years. The machines simply did not stop.

Jaap van der Meer Harbor Authority, Rotterdam

The retrofit paid back in 26 months. GreenForge kept half our old steel and told us honestly which half had to go.

Alicia Fremont County Waste Director, Ohio

From forest slash to grid power in one integrated line. Their commissioning crew stayed until every operator could run it blindfolded.

Robert Chen CEO, Sierra Renewables
GreenForge installation on site GreenForge installation on site
Proof on the ground
Results our municipal and industrial clients measure
0 +

Systems installed

Across municipal and industrial sites.

0 %

Average cost cut

Operating savings versus legacy equipment.

0 tons diverted — and counting