01 — Engineering
No two waste streams are alike, so no two GreenForge machines are either. We run your material sample through our Portland test line, then size rotors, screens, membranes, and drives against measured — not assumed — data.
02 — Delivery
Foundations, rigging, electrical, PLC integration, and safety certification — one contract, one commissioning team, one date on the calendar. Average install-to-first-ton: 11 days.
03 — Support
Wear-part programs, remote telemetry with predictive alerts, and mid-life retrofits that add capacity without a new foundation. Machines from 2009 are still on service contracts today.
We sample your stream and measure the real numbers on-site.
Mass-balance modeling and machine sizing from test-line data.
Cut, welded, and assembled in Portland. You can watch.
Our crew installs, certifies, and trains your operators.
Telemetry, wear parts, and retrofits for decades of duty.
MRF retrofits, bulky-waste shredding, and leachate treatment for cities from 40k to 4M residents. We design around collection reality, not brochure assumptions — contamination rates, seasonal surges, and all.
Depackaging lines that separate product from packaging at 98% purity, plus AquaPure skids that close the water loop on wash-down lines. Hygienic-grade stainless available on every touchpoint.
C&D shredders with tramp-metal armor for rebar-laced concrete, plus screening and washing systems that turn demolition rubble into certified recycled aggregate.
Manure separation, digestate drying, and orchard-waste densification. SolarDry units run on waste heat from your digester — fuel out, no fuel in.
Removal efficiency
Contaminant reduction on target streams.
Continuous duty
Built to run without a scheduled stop.
From wastewater clarifiers to emissions scrubbers to recycling lines, each system is sized to your actual load and the limit you have to meet — not a catalog average.